top of page
Drainage Stabilization Project in Geneva
Two grade control structures and rip rap lining were installed within a drainage near Reed Road in the Town of Geneva. The stabilization of this headcut will reduce erosion and sediment loss from the drainage area that turns into a stream running to Seneca Lake and will reduce the amount of nutrients and sediment entering the lake. The project was complete through a partnership with the Town of Geneva and Ontario County DPW.
bottom of page