top of page
< Back

Briggs Gully Streambank Erosion Control Project

The Briggs Gully Stream Bank Erosion Control Project was funded through WQIP Round 11. Over the years, a substantial amount of erosion had occurred due to the high velocity of the water. This project utilized rip rap to stabilize the streambank and protect the bridge at Briggs Gully.

Briggs Gully Streambank Erosion Control Project
bottom of page