top of page
Briggs Gully Streambank Erosion Control Project
The Briggs Gully Stream Bank Erosion Control Project was funded through WQIP Round 11. Over the years, a substantial amount of erosion had occurred due to the high velocity of the water. This project utilized rip rap to stabilize the streambank and protect the bridge at Briggs Gully.
bottom of page